A feasibility study of an earthquake early warning (EEW) system was conducted for the Eastern Caribbean region using scenario earthquakes, corresponding to the maximum credible earthquakes and to the earthquakes associated with a return period of 475 years. Broadband synthetic seismograms were produced at selected critical facilities, where there is potential interest in the installation of an EEW system. The expected damage was derived from the synthetic seismograms and compared with the lead-time determined for both a regional and on-site EEW configuration. Next, the Virtual Seismologist EEW algorithm, as included in SeisComP3, was tested. Additional broadband synthetic seismograms were produced for the stations in the Eastern Caribbean seismic networks in order to simulate the real time behaviour of the seismic networks during the occurrence of the synthetic earthquakes and to assess the predictive capacity of the selected ground motion prediction equation. Expected peak ground parameters and lead-times at the critical facilities constitute the major outcome of the study

Earthquake early warning scenarios at critical facilities in the Eastern Caribbean

Di Sarno L;
2016-01-01

Abstract

A feasibility study of an earthquake early warning (EEW) system was conducted for the Eastern Caribbean region using scenario earthquakes, corresponding to the maximum credible earthquakes and to the earthquakes associated with a return period of 475 years. Broadband synthetic seismograms were produced at selected critical facilities, where there is potential interest in the installation of an EEW system. The expected damage was derived from the synthetic seismograms and compared with the lead-time determined for both a regional and on-site EEW configuration. Next, the Virtual Seismologist EEW algorithm, as included in SeisComP3, was tested. Additional broadband synthetic seismograms were produced for the stations in the Eastern Caribbean seismic networks in order to simulate the real time behaviour of the seismic networks during the occurrence of the synthetic earthquakes and to assess the predictive capacity of the selected ground motion prediction equation. Expected peak ground parameters and lead-times at the critical facilities constitute the major outcome of the study
2016
early warning; earthquakes; critical facilities
File in questo prodotto:
File Dimensione Formato  
BEE_2016_FULL.pdf

non disponibili

Licenza: Non specificato
Dimensione 1.61 MB
Formato Adobe PDF
1.61 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12070/6708
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 6
social impact