The definition of the electric energy procurement plan represents a fundamental problem that any consumer has to deal with. Bilateral contracts, electricity market and self-production are the main supply sources that should be properly combined to satisfy the energy demand over a given time horizon at the minimum cost. The problem is made more complex by the presence of uncertainty, mainly related to the energy requirements and electricity market prices. Ignoring the uncertain nature of these elements can lead to the definition of procurement plans which are infeasible or overly expensive in a real setting. In this paper, we deal with the procurement problem under uncertainty by adopting the paradigm of joint chance constraints to define reliable plans that are feasible with a high probability level. Moreover, the proposed model includes in the objective function a risk measure to control undesirable effects caused by the random variations of the electricity market prices. The proposed model is applied to a real test case. The results show the benefit deriving from the stochastic optimization approach and the effect of considering different levels of risk aversion.

A probabilistically constrained approach for the energy procurement problem

Violi A.;
2017-01-01

Abstract

The definition of the electric energy procurement plan represents a fundamental problem that any consumer has to deal with. Bilateral contracts, electricity market and self-production are the main supply sources that should be properly combined to satisfy the energy demand over a given time horizon at the minimum cost. The problem is made more complex by the presence of uncertainty, mainly related to the energy requirements and electricity market prices. Ignoring the uncertain nature of these elements can lead to the definition of procurement plans which are infeasible or overly expensive in a real setting. In this paper, we deal with the procurement problem under uncertainty by adopting the paradigm of joint chance constraints to define reliable plans that are feasible with a high probability level. Moreover, the proposed model includes in the objective function a risk measure to control undesirable effects caused by the random variations of the electricity market prices. The proposed model is applied to a real test case. The results show the benefit deriving from the stochastic optimization approach and the effect of considering different levels of risk aversion.
2017
Chance constraints; Energy procurement; Risk management
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12070/42400
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 15
  • ???jsp.display-item.citation.isi??? 13
social impact