The work fronts the problem of preventive maintenance costs for electric devices in case of power factor correction. The model presented uses a set of costs related to the context of power factor correction. The graphical representation of the total costs with respect to the intervention time of preventive maintenance allows the identification of the optimal time of a preventive maintenance, minimizing the total maintenance costs. The experimental case has provided a valid test bed to related to the values for those primary costs included into the model.
Titolo: | Cost optimization of preventive maintenance plan through reactive power analysis: An action research for high power electric engines | |
Autori interni: | ||
Data di pubblicazione: | 2015 | |
Handle: | http://hdl.handle.net/20.500.12070/11733 | |
Appare nelle tipologie: | 4.1 Contributo in Atti di convegno |
File in questo prodotto:
File | Descrizione | Tipologia | Licenza | |
---|---|---|---|---|
RW Grubbstrom Abstract ICPR Manila.pdf | N/A | Non specificato | Administrator Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.